Q How do your factory do regarding quality control?
A Quality is 1st priority. We always attach great importance to quality controlling from raw material to shipping. Inspection report would be sent, accept your inspector or 3rd party for inspection.
Q What’s the packaging option or included?
A
(1) polybag could be printed (warning words)
(2) Color box with your design
(3) Headcard
(4) Giftcard
(5) Hangtag
(6) Inside label, sticker with bar code
Q What’s your payment term?
A
T/T or L/C.
Logo Options
Print, Embroider, Woven Label, Metal patch, Rubber patch, Emboss.
Q What’s the certificate you have?
A BSCI, SEDEX-4P, Wal-mart, Disney, NBCU.
Q What’s the MOQ and lead time?
A MOQ is 300pcs, 45-55days. Order Schedule would be offered.